Please use this identifier to cite or link to this item: http://hdl.handle.net/10267/10595

Title: Trench dug during refectory renovations, July, 2011
Authors: Gates, Elizabeth E.
Keywords: Buildings and grounds;Images;Catherine Burrow Refectory;Renovations
Issue Date: 21-Jul-2011
Publisher: Memphis, Tenn. : Rhodes College
Series/Report no.: Digital Image Collection;
Buildings and Grounds;
Abstract: The trench was dug to reroute some pipes on July 21. By July 25, the trench was closed.
URI: http://hdl.handle.net/10267/10595
Appears in Collections:Campus Buildings and Grounds

Files in This Item:
File Description SizeFormat 
Trench_July 21_2011 026.jpg86.05 kBJPEGThumbnail
View/Open
Trench_refilled_July_25_2011 052.jpg77.87 kBJPEGThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.