Please use this identifier to cite or link to this item:
http://hdl.handle.net/10267/10595
Title: | Trench dug during refectory renovations, July, 2011 |
Authors: | Gates, Elizabeth E. |
Keywords: | Buildings and grounds;Images;Catherine Burrow Refectory;Renovations |
Issue Date: | 21-Jul-2011 |
Publisher: | Memphis, Tenn. : Rhodes College |
Series/Report no.: | Digital Image Collection; Buildings and Grounds; |
Abstract: | The trench was dug to reroute some pipes on July 21. By July 25, the trench was closed. |
URI: | http://hdl.handle.net/10267/10595 |
Appears in Collections: | Campus Buildings and Grounds |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Trench_July 21_2011 026.jpg | 86.05 kB | JPEG | View/Open | |
Trench_refilled_July_25_2011 052.jpg | 77.87 kB | JPEG | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.