Please use this identifier to cite or link to this item: http://hdl.handle.net/10267/29953

Title: "Slurry Method May Stabilize Tunnel Cost At $100 Million"
Authors: Sternberg, Irma O.
Keywords: Overton Park (Memphis, Tenn.);Sternberg, Irma O., 1915-2007;Text
Issue Date: 24-Apr-1975
Publisher: Commercial Appeal
Abstract: The cost of a cut-and-cover tunnel under Overton Park in Memphis may be considerably less than initial estimates of $160 million.
Description: Scanned by Will Clinton, Archives RSA, Class of 2019.
URI: http://hdl.handle.net/10267/29953
Appears in Collections:Irma O. Sternberg Overton Park Expressway Collection

Files in This Item:
File Description SizeFormat 
OPE-23_031.pdf1.38 MBAdobe PDFThumbnail
View/Open
OPE-23_031.jpg3.46 MBJPEGThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.