Loading...
Thumbnail Image
Publication

Trench dug during refectory renovations, July, 2011

Gates, Elizabeth E.
Citations
Altmetric:
Contributor
Photographer
Artist
Editor
Advisor
Keywords
Buildings and grounds, Images, Catherine Burrow Refectory, Renovations
Local ID
Abstract
The trench was dug to reroute some pipes on July 21. By July 25, the trench was closed.
Description