Please use this identifier to cite or link to this item:
http://hdl.handle.net/10267/29961
Title: | "Slurry-Wall Plans For I-40 To Get State, Federal Study" |
Authors: | Sternberg, Irma O. |
Keywords: | Overton Park (Memphis, Tenn.);Sternberg, Irma O., 1915-2007;Text |
Issue Date: | 5-Jun-1975 |
Publisher: | Commercial Appeal |
Abstract: | A study will be conducted on the plans to build I-40 through Overton park using the slurry method. |
Description: | Scanned by Will Clinton, Archives RSA, Class of 2019. |
URI: | http://hdl.handle.net/10267/29961 |
Appears in Collections: | Irma O. Sternberg Overton Park Expressway Collection |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
OPE-24_004.pdf | 454.62 kB | Adobe PDF | View/Open | |
OPE-24_004.jpg | 1.1 MB | JPEG | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.