Please use this identifier to cite or link to this item: http://hdl.handle.net/10267/29961

Title: "Slurry-Wall Plans For I-40 To Get State, Federal Study"
Authors: Sternberg, Irma O.
Keywords: Overton Park (Memphis, Tenn.);Sternberg, Irma O., 1915-2007;Text
Issue Date: 5-Jun-1975
Publisher: Commercial Appeal
Abstract: A study will be conducted on the plans to build I-40 through Overton park using the slurry method.
Description: Scanned by Will Clinton, Archives RSA, Class of 2019.
URI: http://hdl.handle.net/10267/29961
Appears in Collections:Irma O. Sternberg Overton Park Expressway Collection

Files in This Item:
File Description SizeFormat 
OPE-24_004.pdf454.62 kBAdobe PDFThumbnail
View/Open
OPE-24_004.jpg1.1 MBJPEGThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.